Scope of project
We recently had the privilege of providing our compliance services to Prostate Cancer UK headquarters, based opposite London Bridge Station
Services
We began by running an overall system check of the building and ran tests to simulate power loss under load. In order to prevent a loss of power to systems we installed and checked the discharge time of the UPS and checked if the system returns to normal once the power was reinstated. On top of this, we cleaned the old UPS and air intakes in order to make sure they were clear of any obstructions.
To further make the office more compliant with industry standards we checked the function of fans and cooling systems to see if there were any signs of overheating.
We also carry out the EICR electrical fixed wire testing and annual emergency lighting drain down.